LAND SURVEYING
MNI WICONI CORE PIPELINE (OSRWSS WATER TREATMENT PLANT OFFICE), PINE RIDGE, SOUTH DAKOTA
- YEAR COMPLETED - PROFESSIONAL SERVICES: 2008
- YEAR
COMPLETED - CONSTRUCTION:
N/A
- PROJECT
OWNER: OGLALA SIOUX TRIBE
Mni Wiconi
Pipeline consists of water treatment plant, several water storage reservoirs
(both ground and elevated), several pump stations, river crossings (both buried
and bridge structure) and approximately 400 miles of generally 16 inch diameter
welded steel water transmission pipeline with some minor PVC branch transmission
pipelines.
Aaron Swan and
Associates (AS&A) provided surveying, construction field engineering and
materials testing services on Phases I, II, III, IV, V, VI, VII, VIII and IX.
Aaron Swan and
Associates is currently providing the surveying, construction field engineering
and materials testing services on Phase VIII and IX of the Mni Wiconi Pipeline
Project. The surveying consists of
establishing control points using conventional total station and GPS.
The project utilizes a coordinate system which traverses from the Ft.
Pierre water treatment plant to the project’s terminus on the Pine Ridge
Indian Reservation; this coordinate system is a modified state plain system.
Once the project’s controls have been set, ASA is required to survey
the proposed alignment and profile a ROW strip.
This information is then provided to the “Design Engineers” for their
approval. After approval, AS&A
will make any necessary adjustments to the alignment and, provide the ROW and
construction staking using the pipe manufacturer’s lay-sheets and design grade
lines.
Also,
AS&A is providing the field engineering that consists of preparing the
SDDENR Surface Water Discharge Permit, Erosion Control Plans, Traffic Control
Plans and Construction Materials Testing.