- PROJECT OWNER: BIA GREAT PLAINS
This Bridge is a single span 96’-0” precast concrete bulb tee unit replacement bridge. The project included Abutments, Concrete Approach Slabs, Asphalt Approaches, Guard Rail and Channel Stabilization. The bridge is over the Spring Creek at the Spring Creek Day School on BIA Route 4.
ASA personnel have received training from the Corps of Engineers and have been certified to perform construction observation and materials testing on Corps Projects.

ASA Material Testing Laboratory personnel are SDDOT certified as QC/QA technicians at various levels 1 through 4 and ACI at various grades. The ASA Lab is accredited AAP and AMRL.