CONSTRUCTION ADMINISTRATION
MNI WICONI CORE PIPELINE, WESTERN SOUTH DAKOTA

- YEAR COMPLETED - PROFESSIONAL SERVICES: 1999
- YEAR
COMPLETED - CONSTRUCTION:
ONGOING
- PROJECT OWNER: OGLALA SIOUX TRIBE
The Mni Wiconi Pipeline
consists of: water treatment plant, several water storage reservoirs both ground
and elevated, several pumpstations, river crossings both buried and bridge
structure, and approximately 400 miles of mostly 26-inch diameter welded steel
water transmission pipeline with some minor PVC branch transmission Pipelines.
Aaron Swan and
Associates (ASA) has provided the surveying, construction field engineering and
material testing services on phases I, II, III, IV, V, VI, and XII.
Aaron Swan and
Associates has provided the surveying, construction field engineering and
material testing services on Phase VIII (Kadoka South), which includes a river
crossing on the White River south of Kadoka. The surveying consists of
establishing control using conventional total station and GPS. The project has a
project coordinate system which runs from the Fort Pierre water treatment plant
to the projects terminus on the Pine Ridge Indian Reservation, this coordinate
system is a modified state plane system. Once the project control has been set
ASA is required to survey the proposed alignment and profile a ROW strip, this
information is then provided to the "Design Engineers" for their
approval. After approval ASA makes any required adjustments in the alignment and
provides the ROW staking and the construction staking from the pipe
manufactures' "lay-sheets" and the design grade lines.
In addition to the surveying services ASA is providing the "Field Engineering" which consists of preparing the USEPA and SDDENR surface water discharge permit, erosion control plans, traffic control plans and material testing.