This project was a twenty-eight block down-town and industrial park area reconstruction. The project comprised of the following: 

·    10,300 L.F. Concrete curb and gutter

·    Utility replacement

·    11,000 S.F. Sidewalk

·    Pavement design

·    Street surfacing

·    Drainage and 3,500 L.F. of storm sewer

·    Surveying and staking

·    Materials testing

·    Project Administration