BRIDGE HYDRAULICS
YELLOW BEAR DAM,
ALLEN
,
SD
- YEAR COMPLETED - PROFESSIONAL SERVICES:
2005
- YEAR
COMPLETED - CONSTRUCTION:
N/A
- PROJECT OWNER: BIA GREAT PLAINS
Aaron Swan and Associates performed their
hydraulic analysis for this project using the HEC-RAS Model (Boss version
3.1.3). This criterion was used to
calculate the water surface elevations and flow volumes for the proposed
structure for 50 year and 100 year storm events.
The data was used to determine the height of the earthen dam (storage
capacity of the reservoir) and the size of the spillway.