BRIDGE HYDRAULICS
PHIESTER
CREEK
BRIDGE
, ROSEBUD INDIAN RESERVATION,
PARMELEE
,
SOUTH DAKOTA
- YEAR COMPLETED - PROFESSIONAL SERVICES: 2000
- YEAR
COMPLETED - CONSTRUCTION:
N/A
- PROJECT
OWNER: ROSEBUD SIOUX TRIBE—TEA-21
Aaron Swan and
Associates performed their hydraulic analysis for this project using the USGS
Water Resources Investigations 35-74, A Method for Estimating Magnitude and
Frequency of Floods in
Drainage area, average slopes and elevations were determined using the USGS 7˝ minute quadrangle maps and local hydraulics survey was performed by Aaron Swan and Associates. The analyses were performed for the design, location and channel protection for a bridge structure over the Phiester Creek on the Rosebud Indian Reservation.