BRIDGE DESIGN

SPRING CREEK DAY SCHOOL BRIDGE,  ROSEBUD RESERVATION, SOUTH DAKOTA

 
YEAR COMPLETED - PROFESSIONAL SERVICES:  2005    
YEAR COMPLETED - CONSTRUCTION:  2005
PROJECT OWNER:  ROSEBUD SIOUX TRIBE – TEA 21  

 

This Bridge is a single span 96’-0” precast concrete bulb tee unit replacement bridge. The project included Abutments, Protected Pedestrian Walkway, Street Lighting, Concrete Approach Slabs, Asphalt Approaches, Guard Rail and Channel Stabilization. The bridge is over the Spring Creek at the Spring Creek Day School on BIA Route 4. The project included Legal and Bridge Location Surveys.  

Aaron Swan and Associates ASA provided the Inspection, Replacement Study including Life Cycle Costs, Environmental Plans including 404 permitting, Design Plans, Erosion Plans. ASA provided full contract administration through the Rosebud Sioux Tribes Transportation Departments 638 program. ASA also provided full construction monitoring and construction staking.